Tag: Architecture

  • Preservation Evaluation: Gustav Stickley’s Log House

    In September 2004 the restoration of Gustav Stickley’s Log House, a National Historic Landmark located at Craftsman Farms in New Jersey, was completed. The house was originally the private residence of Stickley from 1911 to 1917. The architectural style epitomizes the Arts and Crafts movement and was meant to be ‘harmonious with its natural setting.’ [1] The house is constructed primarily of exposed chestnut log walls, with Ludowici tiles on the roof and a fieldstone foundation.

    image

    (Photo Credit: Ron Anthony, APT Bulletin 36, No.2/3)

    (more…)

  • Condition Survey: Simpson Building, Mount Dora, Florida

    image

    The Simpson Building is a historic, brick building located in downtown Mount Dora, Florida. Built in 1925 it originally served as a hotel; current day the four storefront spaces on the main level are rented to four different business owners, with each store operating a separate HVAC system. From the exterior, the building appears to have various moisture problems which can be observed through: salt deposits, mold and mildew, rust and stains, cracked window frame, and cracked and missing bricks. The best ways to prevent these moisture problems would be to: clean the exterior walls regularly, investigate the water runoff system and/or instill a properly functioning system, make sure all the window and door frames are repaired and in good condition, and insure that HVAC systems are in proper working condition.

    (more…)

  • Condition Survey: The Donnelly House, Mount Dora, Florida

    image

    The Donnelly House was built in 1893 in Mount Dora, Florida, by John P. Donnelly, originally of Pittsburgh, PA. Mr. Donnelly had moved from Pittsburgh to Mount Dora in 1879 and became the town’s first mayor. This house was built years later and was designed by the architect George Franklin Barber, as a mail order house in the Queen Anne style. He was very famous at the time for his mail order houses which were sent to various towns and cities across the nation. Currently this house is the home of the Mount Dora Lodge No. 238 F&AM, where they host meetings and gatherings of the club.

    (more…)

  • Public Use Versus Eminent Domain

    The concept of public use, while initially a great concept, has deteriorated to bureaucratic debacles. Progressive thought, especially from the 1920s has inadvertently provided governments (local, state and federal) with powers that can be manipulated for the good or the detriment of the people these laws were written to help. It is dependent upon the outlook, interpretation, and ideology of those enforcing or citing these laws. The initial concept of the laws were good, while the unseen consequences have been mixed. While trying to maintain an order and preservation of historic sites, sometimes the bigger picture is completely overlooked.

    The concept of eminent domain has been abused by politicians and developers alike. The designation of certain properties and sites as historic resources has also come into question due to the underlying ideology and motive of those involved in fighting for or against such designations. What constitutes a historic designation? Does the fact that the building is over a certain age deem it historic alone? Should there not be some significant event tied to the property or the site if it 50 years or older before it can be deemed appropriate?

    The federal government was forced to step in and set up standards to preserve certain areas, sites and buildings to keep them from being destroyed. They also helped organize funding to aid in defraying expenses incurred in restoring and preserving these historic monuments. This was done through standards set forth and encouraged to be adopted by state and local governments to preserve these sites. Most individuals were not able financially to preserve or rehabilitate historic site, nor did they have the knowledge of what they had to do and avoid. Through the laws of 1906 through present day, the federal government has been able to help state and municipal governments understand and direct restoration, preservation and conservation of these various sites.

    While some states were ahead of the federal government, in their pursuit to maintain historic sites, most were not and had to be guided by standards to which everyone could adhere. Tax laws have been implemented to encourage preservation initiatives, which has helped many individuals wanting to preserve the past.

    The concept of public use has changed drastically through its inception to present day. In many instances this has been for the good, but as with a blanket coverage, instances can be cited to show this can be abusive, as was the case of Kelo versus the City of New London (Connecticut). It was ruled appropriate for the government to use eminent domain to seize land from a private owner for the sale to a private developer, as the government claimed this would increase the tax base of the town. The proof in this particular instance has not yet born out and a family’s property was inappropriately seized – not for the sake of the community, but for the sake of the developer.

    Other instances have arisen, such as St. Bartholomew’s Church in New York City, whose congregation applied to construct a high-rise office tower on property they owned, in order to provide an income to handle expenses of the church. The ruling of the New York City Landmark’s Preservation Commission was to deny such a building permit because of its inappropriate scale. The church, designated a historic landmark in 1967, wanted to build a 57-story office complex with a reflective glass façade to provide an income that would fund various church projects including the restoration and maintenance of the church. While it is agreed that this 57-story building would be inappropriate for such a site, there was no alternative offered by either side. The public use concept was appropriately incorporated in the denial of this permit.

    The concept of public use has changed greatly throughout the years and though there have been some major hiccups along the way, for the most part the laws and organizations formed have helped historic preservation move forward. There is no absolute ruling with regards to preservation, it is a case-by-case situation, and every case must be explored and reviewed before any headway is given. The good thing about having previous cases, laws and ruled of enforcement is that we can learn and draw from them as preservation advances and learn how to work with them or challenge them when necessary.

  • Restoration of the Norwich Cathedral

    Restoration of the Norwich Cathedral

    Norwich Cathedral, located in Norwich, Norfolk, England, was constructed between 1080 and 1120 in the Norman Romanesque style. It was built using flint and mortar, then it was covered in limestone. In 1463, the spire of the cathedral was hit by lightning, causing a fire and damaging the building. The Bishop at the time ordered a construction of a new spire, which was constructed of brick faced with stone, supported on brick squinches that were built into the tower. B.M. Feilden, the conservator architect for this restoration was commissioned to work on the Cathedral. Through visual analysis of the structure, he was able to establish: that the spire had cracked vertically on every side (8 sides in total), external stone was decayed and bulging and the internal brickwork was horribly decayed in several places. It was also discovered that a major crack had established between the stone and the brick core, likely caused by wind vibration.

    Feilden’s approach for restoration was based on his belief that since the spire had managed to survive 500 years, post completion by John Everard in 1466, then there was no reason why it could not be restored to its original strength to withstand at least another 100 years. His proposal was to grout the voids existing between the stone casing and brick core, then introduce the insertion of ties across the brick’s vertical cracks with occasional ring beams. Due to the weak condition of the spire, Feilden opted not to add extra weight to the existing wind loading, therefore the scaffolding would need to be an independent element. He designed a “central octagonal ring with spring loaded ties to 8 external channels at the angles to restrain the spire at its weakest point.” [1]

    It took 2 years through very harsh winters to complete the project. The first step taken was to fuse the interior junction of stone and brick through the use of grout. After that the ties were cut in and the masons hired to complete the brickwork began to cut out the defected bricks in 18-inch vertical strips. From the beginning, Feilden had warned the masons to only work at 3 places at once, which they ended up ignoring, causing severe damage to the already weak spire. It was discovered that the spire had moved while the masons were working on the brick, due to the fact that they opted to work at 9 different places at once instead of the recommended 3. Upon further investigation it was made apparent that there had been displacement along with the start of a crack around the circumference. The brick openings were immediately filled.

    After completion of this restoration, a maintenance plan was formed and put into action. Every 5 years inspections would be carried out and every year the bays would be cleaned. After the cleaning, any damages discovered would be examined, with greater attention placed on the horizontal weatherings and pointing. Feilden claimed a proper maintenance program would be far more beneficial in the philosophy of repair versus restore. He also created a sliding scale of which to compare with visual analysis during maintenance checks; Immediate, Urgent, Necessary, Desirable, Monitor (with Immediate needing the quickest attention). Feilden believed using the same crew for maintenance every year would help diminish unnecessary problems from taking place.

    [1] Feilden,B.M., “From Restoration to Maintenance: A Case Study of Norwich Cathedral,” APT Bulletin Vol. 21, No. 3/4 (1989): 25.

  • ACL Railroad Station, Mount Dora, Florida

    ACL Railroad Station, Mount Dora, Florida

    The Old Mount Dora A.C.L. Railroad Station was originally constructed in 1886 in downtown Mount Dora, Florida. The town would go through about three depots. The third and final depot was built in 1915. It was a one-story building, built in the Frame Vernacular architectural style. At that time in history, it took about $ 8000 to complete the construction. It was built through the Atlantic Coast Line Railroad, which primarily served the South, covering distances from Alabama to Florida to Virginia.

    The last passenger train to pass through Mount Dora made its last strip in 1950, while freight was still running until 1973. From 1973, this third depot has been adapted to house the local Chamber of Commerce for Mount Dora. It was added to the National Registry in 1992, with historic significance listed as an event. That event was the fact that it was the third and last depot built in Mount Dora and that in 1950, it was the last time an Atlantic Coast Railroad passenger train would run on this line. The area of significance and the historic function are both denoted as transportation, as it was based on the railroad. [1]

    It is now a privately owned building, functioning as the Chamber of Commerce, where information pertaining to the town as well as the historic background of the station can be found.

    [1] “Florida Lake County,” National Register of Historic Places, accessed 19 October 2013, http://www.nationalregisterofhistoricplaces.com/FL/Lake/state.html, Old Mount Dora A.C.L. Railroad Station.

  • Preservation Evaluation: Gustav Stickley's Log House

    Preservation Evaluation: Gustav Stickley's Log House

    In September 2004 the restoration of Gustav Stickley’s Log House, a National Historic Landmark located at Craftsman Farms in New Jersey, was completed. The house was originally the private residence of Stickley from 1911 to 1917. The architectural style epitomizes the Arts and Crafts movement and was meant to be ‘harmonious with its natural setting.’ [1] The house is constructed primarily of exposed chestnut log walls, with Ludowici tiles on the roof and a fieldstone foundation.

    The third phase of restoration began in 2001, when the deterioration of the logs became quite notice1able. To ensure the structural integrity of the logs, the preservation team needed to examine the building. Resistance drilling was chosen as the least destructive means of investigation; meaning a ⅛” to ¼” drill bit would be drilled into the logs while the resistance would be recorded. For this project, the IMLRESI (manufactured by IML GmbH of Germany) system, of resistance drilling was used to record the data to show ‘the internal voids and intermediate stages of decay.’

    From the beginning the team wanted to ensure the preservation of the logs would retain the structural integrity of the house. An architect, material conservator and structural engineer investigated the house, looking for any material deterioration, significant movements, discolorations, growths, etc. Load distributions and performance were analyzed, which found the presence of overstressed elements. There proved to be deterioration of the logs on each of the exterior elevations, due to rot and termites. Because the house was primarily wood, the team feared the damage could be more extensive and expansive. They discovered further rot damage from the rafters to the porch’s ceiling joists to a post on the north corner of the west elevation.

    They wanted to make sure they could locate and quantify the extent of the total deterioration. The team opted to perform a visual examination of the lower courses of the exterior logs, joists and all the exterior openings, while probing the logs to measure the moisture content. Since majority of the wood rot occurs from the center out, exterior damage is not as evident, but they hoped the probing during examination would allow for instant detection of any voids. The moisture content of the logs ranged from 8%19% but it was noted that this had been measured in the midst of a several month-long drought, meaning the readings may not have been typical. Because so much damage had been discovered, the team realized these readings were not truly indicative of the extent of moisture and active decay. They opted to perform another round of resistance drilling on these lower courses of logs, color coding their findings based on the severity of the damage. Majority of the logs at the base, those adjacent to the window sills and the overhanging logs at the wall corners were all requiring repair. Wood epoxy was used to repair some of the concealed areas, but for the exterior repair, the the damaged logs needed to be carefully removed and replaced with salvaged chestnut logs.

    The process of removing and replacing the logs was quite a challenge for the team, as the house’s remaining structure of the logs required further support, so the deteriorating logs could be cut and removed. The team worked together with a contractor’s engineer and were able to find a plan to replace all the logs at the base. During the remedying of the porch, it was discovered that half the ceiling joists had wood removed to host space for exterior lights; this had compromised the strength of the log beams causing them to become overstressed. They opted not to replace them, as the cutouts would still be necessary. Instead, the team considered it better to reinforce the existing logs. They had the choice of using carbon-fiber composites or steel plate insertions, which they ended up using the latter. To do this, the second floor was shored, so that the logs could be temporarily removed. The logs were treated like a sleeve, so as to conceal the steel plates within, which were shaped to align with the ceiling contours. For the repair of the corner post, it was decided to introduce new stainless-steel elements as the damage of the wood post was so extensive. It was attached to both the new and original wood logs.

    In my opinion, the use of resistance drilling made it possible to efficiently solve and remedy the deterioration of the logs. In the process of remedying the damaged wood, all effort was made to preserve as much of the existing logs as possible. The repairs which required replacements and the use of epoxy seemed necessary and it came across that the team had carefully debated these choices before implementation. However, I do not necessarily agree that a completely different material should have been introduced for the corner post. If the previous wood post was so far damaged, I believe they should have replaced it with a salvaged piece of log, just as the logs for the walls had been replaced. It seems that through the introduction of a stainless-steel post that some of the integrity of the house was changed.

    [1]

    Radcliffe Trenner, Anthony and Meade, “Wood Assessment and Repair of Gustav Stickley’s Log House at Craftsman Farms, New Jersey.” APT Bulletin 36, No.2/3 (2005): 2936

  • Condition Survey: Simpson Building, Mount Dora, Florida

    Condition Survey: Simpson Building, Mount Dora, Florida

    The Simpson Building is a historic, brick building located in downtown Mount Dora, Florida. Built in 1925 it originally served as a hotel; current day the four storefront spaces on the main level are rented to four different business owners, with each store operating a separate HVAC system. From the exterior, the building appears to have various moisture problems which can be observed through: salt deposits, mold and mildew, rust and stains, cracked window frame, and cracked and missing bricks. The best ways to prevent these moisture problems would be to: clean the exterior walls regularly, investigate the water runoff system and/or instill a properly functioning system, make sure all the window and door frames are repaired and in good condition, and insure that HVAC systems are in proper working condition.

  • The Great Scrape vs. Antiscrape Debacle

    Considering this debate has been going on strong since the 19th century, it is impossible to state which is the best avenue of preservation, Scrape or Antiscrape, as both are founded with equally convincing principles and beliefs. Viollet-Le-Duc was on one extreme and Morris and Ruskin were on the opposite side, similar to a game of tug-of-war. While Le Duc and company were adamant in their beliefs that old and ruined buildings deserved to be in completion, they failed to see a problem with the possible disconnect which would arise with the fate of the intended structure in hands of another ‘artist’ applying their interpretation. I have a hard time accepting this methodology, knowing the thought, meaning and outcome of the building are forever changed from their original concept. To an extent, I agree with the Antiscrapists, a building must not be a lie. Everything ages with time, including structures, monuments, objects, buildings, etc., but indeed prevention is better than cure, and in this case taking heed from Ruskin in using preventative measures and doing one’s best to properly maintain and manage a structure from time to time is far more beneficial to that structure than a total recreation of a memory. The best thought seems to be a middle ground between the Scrapists and Antiscrapists, taking every project into consideration and seeing where it falls in line.. (Is it completely in ruin? Can it be renovated and aided with minimal interference? Does it have the problem of being transformed to something completely alien to its original form? )